Jiaozuo Zhongli New Energy Equipment Co., Ltd.
Products
Contact Us
  • Contact Person : Ms. Wong Kitty
  • Company Name : Jiaozuo Zhongli New Energy Equipment Co., Ltd.
  • Tel : 86-391-3262578
  • Fax : 86-391-3262578
  • Address : Henan,jiaozuo,District of Jiaozuo City, ma hole to be Wang Zhendong Village South
  • Country/Region : China

2012 new design to get rubber powder

2012 new design to get rubber powder
Product Detailed
Related Categories:Waste Management
rubber powder 1.Q345R and 16mm boiler plate 2.Power consumption is 11kw 3.Fully automatic

                       2012 new design to get rubber powder

1.The main parts and the function of the pyrolysis machine

a) The reactor

The raw materials are pyrolyzed in the reactor,it is 245R boiler steel.the thickest part could be 16mm.It works doesn't like the traditional way that we burn something,we make the waste pyrolyzed at certain temperature,so it without air or water.In a word,it has the same function to kiln,so I think it’s your poitnt.

  

b) Oil reacting tank

The first step to deposit the waste in the tyre gas to make sure the clearness of oil.

c)Gas separate

The impurities will be deposited at the bottom of the gas separate.

d)Depositing tank

The second filter,so that the oil gas will be refined.

e)Cooling pool

The oil gas will be cooled down in the cooling pipes of the cooling pool.

f)Oil tank

It can store the crude oil.

g)mpact duster collector

The first step to purify the waste in the air.

h)Water film cyclone

The second step to clean the waste in the air.

i)Chimney

The white smoke without pollution will release into the air from the chimney.

2.The advantages of our machine

a) the material of the reactor is 16mm boiler plate,and it’s more useful than the 12mm and 14mm one.

b)The cooling tubes we use is 10tubes,the diameter is 220mm,no jamming concerns and easy to maintenance.

c)The horizontal cooling pool without electricity machine can save more electricity than vertical one.

d)3 parts to clean the waste in the gas,no pollution to the environment.

e)Recycling the waste gas as fuel to burn after 2hours.

f)Big draft fan take away the smoke slao keep the temperature in the reactor.

g)With safety valve to control the pressure to make sure the safety.

2012 new design to get rubber powder



Copyright Notice @ 2008-2022 ECBAY Limited and/or its subsidiaries and licensors. All rights reserved.